Nobody looks forward to a haul-out. The boat is out of service, the bills arrive quickly, and a simple bottom job has a way of growing. Most of what goes wrong in a yard period, though, goes wrong before the boat is lifted. A haul-out that starts with a clear plan usually finishes closer to its schedule and budget.
Write the scope before lift day
The most useful document in any yard project is a written work list, prepared before the boat arrives. It should describe each job specifically enough that the yard can estimate it, schedule it, and order parts.
- List every known item. Include everything from bottom paint and running gear to the leaking hatch and the noisy pump.
- Describe symptoms, not guesses. "Vibration above 1,800 rpm on the starboard shaft" gives the yard far more to work with than "check the props."
- Separate inspections from repairs. Note what you want inspected versus repaired, so the yard reports findings before starting discretionary work.
- Set expectations for changes. Agree on how additional findings and changes will be approved and priced.
- Ask for time estimates. Get one for each item so you know how long the total yard period will run.
Talking with the yard's service manager before booking also helps. Yards know which jobs can run in parallel, which need specific weather, and which depend on parts with long lead times.
Below-waterline and mechanical work first
A haul-out is the only time some parts of the boat can be reached, so those jobs get priority. Cosmetic work can usually be done in the water. Running gear and through-hulls cannot.
- Running gear. Props, shafts, struts, cutless bearings, and rudders inspected for wear, damage, and play.
- Through-hulls and seacocks. Every one operated, inspected, and serviced or replaced as needed.
- Anodes. Replaced, and the wear pattern noted for clues about the boat's electrical health.
- Hull. Inspected for blisters, impact damage, and cracks before new paint covers them.
- Bottom paint. Prepared properly for the antifouling system the boat uses, since many paint failures trace back to surface preparation.
- Mechanical systems. Engines, generators, thrusters, stabilizers, and seawater-cooled equipment, especially anything easier to reach with the boat out of the water.
Varnish, cosmetic fiberglass, and interior projects can follow if time and budget allow.
Coordinate the work and the calendar
Most yard projects involve several kinds of work at once: the yard's own crew for hauling, pressure washing, and paint, plus mechanics, electricians, and specialists such as electronics or canvas installers. Each needs access to the boat, and some jobs cannot overlap. Paint cannot go on while someone is grinding next to it. Engine work may need the boat's power on while electrical work needs it off.
A single, realistic schedule agreed with the yard before work begins keeps those trades from waiting on each other. Regular progress updates, ideally with photos, keep the owner informed without adding changes midstream.
Inspect the work and the invoice
Before the boat goes back in, the finished work should be inspected while it can still be seen. Check that new anodes are installed and tight, seacocks operate, the bottom is painted where it should be, and the running gear turns freely. Hidden work, such as a replaced cutless bearing, is worth photographing during the job.
Invoices deserve the same care. Compare them line by line against the approved scope and any approved changes. Questions are much easier to settle with the boat still in the yard than weeks later.
Splash and sea trial
The last step is putting the boat back in the water and confirming everything works. Watch for leaks at through-hulls and shaft seals right after the lift, then run the boat to check engines, gear, steering, and any systems that were serviced. A short sea trial catches problems while the yard can still address them.
Matthews Marine Services provides haul-out and yard project management for boats in St. Petersburg, Tampa, Clearwater, and around Tampa Bay.